
A view of the low-level icing platform and PRR freight house. Head end reefers are given about 30 minutes real time to be iced and returned to the station on the high level. The icing platform is a modified and much distressed Walthers kit. On the high level can be seen G5 4-6-0 5716 passing the REA facility with an eastbound commuter train.
Continental Modeller.
A pair of B6sb 0-6-0 switchers are observed working the high and low level tracks.